Examples of the range of projects undertaken:
- TRAINING
- STRATEGY STUDIES
- SYSTEM IMPLEMENTATION
- SYSTEM DESIGN
- PRODUCT DEVELOPMENT




TRAINING

Set up 6-monthly UK Wind Training Workshop (et seq),1978,UK,CAT

Set up and lectured at first National Wind Energy Workshop,1982,Yantai, China,DfID

Development of training web site, SWECS; 2000/01 ITPower/EU

Project for the Commercialisation of Renewable Energy in China: UNDP/GEF;Training Workshops, various locations; 2000

>Back to Top




STRATEGY STUDIES

Wind Telecoms Market Study,1985,World,Plessey Aerospace

Assessment of potential for Renewables,1989,Guyana,CAFOD

Market Study for Wind Energy (with Garrad-Hassan),1990,World,DTI

Wind Atlas strategy and intitial implementation,1996,Zimbabwe,ZERO

Renewables Rural Dissemination Strategy; 1999/00, Guyana.

Study of integration of renewables into weak networks, 1998, Isle of Man, Dept of Energy

Country assessment of potential for Renewables,1979,Mongolia,UNDP

>Back to Top




SYSTEM IMPLEMENTATION

Wind/Diesel Island power supply,1980,Falkland Islands,FIDC

25 Demonstration Transportable wind-battery systems,1981,Mongolia,UNDP

Prototype Wind/PV telecom system design and supply,1983,Spain,BP Ventures

Multiple-source wind/hydro/diesel system for island,1986,Foula, Scotland,HIDB

Wind/Diesel Island power supply,1986,Kong Dong, China,DfID

Integrated hydro-diesel network for community,1988,Falkland Islands,FIDC

High school Wind/PV/Diesel hybrid,1989,Trinidad,CAFOD

Wind/PV comparative study for Health Clinics, supply of equipment,1993,Zimbabwe,ZERO

Centralised Grinding Mill Battery Filling Station Programme,1995,Zimbabwe,DfID;(1998 WorldAware Award)

Site Assessments for Windfarms, supply of equipment.,1997,Namibia,Dept of Energy

Site Assessments for Windfarms, supply of monitoring equipment.,1999,UK, Eire

Tilt-up Met Masts to 70m - design and production manufacture 2003 Ecotricity

Development of dedicated anemometry and datalogging 2005 Ecotricity

>Back to Top




SYSTEM DESIGN

Assessment studies for wind industrial park applications from 500kW to 15MW Ecotricity/various

Design of Wind-Diesel Hybrid systems for two offshore islands; 2000/01;Provision of specifications and support for supplier(s), commissioning overview; 2001/--

Project Management and Technical Support, Domestic grid-connected PV roofs and 2.5kW wind system; 2000/02, Wind&Sun

24hour Power for Off-grid Consumers; Specification of equipment, Setting up local infrastructure, Drafting of grant scheme, Implementation; 1999/00, Isle of Man, Dept of Energy

24hour Power Camp Project; Specification of equipment, Setting up local infrastructure, Drafting of grant scheme, Implementation overview;1995/6,Falkland Islands Development Corporation

Study of Wind/PV Island Power Supply,1985,Greece,BP Ventures

>Back to Top




PRODUCT DEVELOPMENT

Design and testing of domestic-scale vertical axis wind turbine 2007 Ecotricity

Lidar and Sodar; assessment and implementation 2008 Ecotricity

Design of Power System: Wind-Assisted Electric Ship, B9 Energy, 2000

Project Management and Technical Re-assessment, Undersea tidal current turbine; MCT/ITPower 1999/00

2.5kW high reliabilty wind turbine design and prototyping,1984,UK,Plessey Aerospace

1kW wind turbine design and demonstration,1998,Zimbabwe,ZERO

Design and testing of 5kW vertical axis wind turbine 1985 New Age Access

Mini-Grid electrical distributed load controllers,1999,Various, Econnect,

Wind/PV/Diesel Test Site, design and supply.,1991,Falkland Islands,FIDC

100kW direct drive grid-connected wind turbine design,1987,UK,DTI

>Back to Top